Nickel alloy, titanium and copper-nickel pipe
Pipe for severe corrosion and seawater service, sourced to order with full mill documentation.
Specifications we supply
| Material | Seamless | Welded | Notes |
|---|---|---|---|
| Inconel 625 (guide) | ASTM B444 | ASTM B705 | |
| Incoloy 825 | ASTM B423 | ASTM B705 | |
| Hastelloy C276 | ASTM B622 | ASTM B619 / B775 | |
| Monel 400 | ASTM B165 | ASTM B725 | |
| Alloy 20 | ASTM B729 | ASTM B464 | |
| Titanium Gr 1, 2, 7, 12 (guide) | ASTM B861 | ASTM B862 | |
| Cu-Ni 90/10, 70/30 (guide) | ASTM B466, EEMUA 144 | ASTM B467 | Marine and seawater |
Pipe weight calculator
Weight per metre and per order, with OD and wall marked on the drawing.
Pipe weight calculator
Weight from ASME B36.10M / B36.19M dimensions and material density.
Plain-end weight, calculated. Mill weights vary within the tolerance of the pipe specification.

Need pipe with flanges and fittings? Quote it as one package.
Send sizes, schedules, grades and lengths. One order, one set of certificates.
Lengths, documents and inspection
Lengths and ends
Single random (about 5–7 m) and double random (about 9–12 m) lengths, or cut to size. Plain or bevelled ends to ASME B16.25.
Documents
Mill test certificates to EN 10204 3.1 with every length, heat numbers matched to the pipe markings. IBR Form III-A for IBR pipe.
Inspection
- Certificate check against your order
- PMI on alloy pipe
- Third-party inspection for 3.2 certification on request
Packing
Bundled with end caps, stainless kept separate from carbon steel, seaworthy packing for export.
Matching flanges and fittings
We manufacture the flanges and fittings for these lines ourselves: Teshi Fittings for flanges and PipeFittings.co.in for butt-weld fittings. Send one BOQ for the whole line.
Questions buyers ask
What lead time should I expect for nickel alloy pipe?
It depends on size and mill stock. Common sizes are often available within a few weeks; others follow mill production. We confirm delivery with the quotation.

Get a quotation from the manufacturer
Send your BOQ, drawing or tender reference. You deal directly with the manufacturer.
- Reply from our estimation team, usually within one working day
- Carbon steel to titanium on one order
- EN 10204 3.1 or 3.2 certificates, third-party inspection welcome
- ISO 9001:2015 certified and IBR approved, since 1971
Drawings and BOQ spreadsheets are easiest by email. Mention your project name.